Self Storage Fire Safety and Building Regulations in the UK: A Developer Checklist
Quick answer: Any self storage facility in the UK must comply with building regulations and fire safety law. Plan escape routes, fire detection and alarms, compartmentation, emergency lighting and a fire risk assessment before you build, and speak early to the building control body and fire service. PSL handles compliance as part of a turn-key project.
Here are the questions we hear most about this topic, answered directly.
Which rules apply to a self storage facility?
New builds and conversions must meet UK building regulations, which cover structure, fire safety, electrics and access. Once open, the Regulatory Reform (Fire Safety) Order 2005 requires a responsible person to carry out and keep up to date a fire risk assessment. Read PSL’s building regulations page for the services we provide.
What fire safety features should I plan for?
- Escape routes that are clear, short enough and signed.
- Fire detection and alarm suited to the layout and risk.
- Emergency lighting along corridors and exits.
- Compartmentation where the design requires fire-resistant separation.
- Fire protection for partitions, mezzanines and structural steel where needed.
- Management plan covering key holders, access and contractors.

How does fire protection affect partitions and mezzanines?
Partitioning, doors and mezzanine floors all form part of the fire strategy, so they should be designed with it, not added afterwards. See PSL’s fire protection, partitioning systems and mezzanine floors.
Who signs it off?
Building control (the local authority or an approved inspector) checks the design and works. The fire and rescue service is consulted on larger or more complex projects. Involve both early to avoid redesign.
What does PSL do on compliance?
PSL keeps centres and units within regulations and health and safety standards during construction. We handle application forms, electrical schematics, calculations and escape route planning, and liaise with the local authority and fire brigade on your behalf.
What is a sensible order of work?
- Survey the building and agree a fire strategy.
- Design the layout with escape routes in mind.
- Submit building regulations information.
- Fit out and test fire systems.
- Complete the fire risk assessment before opening.
Our turn-key project management covers this from start to finish. Contact PSL to talk it through.
Frequently asked questions
Do self storage facilities need a fire risk assessment?
Yes. The Regulatory Reform (Fire Safety) Order 2005 requires a responsible person to complete and maintain one.
Does a self storage conversion need building regulations approval?
Usually yes, covering fire safety, escape routes, structure and electrics.
Can PSL handle building regulations applications?
Yes. PSL handles application forms, calculations, electrical schematics and escape route planning.
Who should I speak to early?
Your building control body and the local fire and rescue service.
Last updated: 11 November 2026


